RIYADH: Saudi Arabia’s The Line project, a 170-km long linear urban development in NEOM, is set to receive bids for its main work package to build spine water transmission by June 1, MEED reported. This package, which will be the latest in a series of tenders for the Line and Spine components, includes design, build, testing and commissioning work for a pressurized permanent water system. As part of the project, the contractors are required to create the complete design — right from the concept to the detailed design — besides providing supply, construction and installation services for the SWT line. The water system includes the SWT line within a reinforced concrete box culvert running along the length of NEOM’s Spine. According to MEED, some bidders have requested an extension of the deadline for the package. The SWT culvert will run parallel to the Spine’s alignment about 360 meters north of the centreline of the Line alignment. The estimated 35-km SWT line will provide potable water for NEOM"s Spine infrastructure and Line buildings. Whereas, contractors of the 160-km long rail line are also expecting NEOM to issue requests for prequalification within the next two months for the work on the high-speed rail line that forms the backbone of The Line. This development stretches from the coast towards Tabuk.
مشاركة :